
News
Wind farm pile work to start amid water worries
January 15, 2018
By Ground Water Canada
By Ground Water Canada
January 15, 2018
By Ground Water Canada
By Ground Water Canada
Jan. 15, 2018, Wallaceburg, Ont. – The Otter Creek wind farm proposed for north of Wallaceburg, Ont., will begin installing and testing piles at three turbine locations starting next week. Residents have voiced concerns that pile-driving vibration in other areas in Chatham-Kent during wind turbine construction has led to water wells becoming black with turbid water and contaminated with heavy metals. The London Free Press reports. | READ MORE